The Physics behind Alternative Energy Sources


Fermilab physicist, Dr. Erik Ramberg describes the reality of using hydrogen fuel cells, biofuel, and other renewable energy sources.

Post to Twitter Tweet This Post

7 Responses to “The Physics behind Alternative Energy Sources”

  • Oneplanet1 says:

    iT CAN POWER UP THE ENTIRE CHINA ON THE COST OF LESS THAN A BARREL OF OIL.

    IT IS HERE. MASS PRODUCTION READY.
    LOWER THAN NORMAL CAPEX.
    100% ZERO GHG EMISSIONS, 100% ZERO GAS, OIL OR COAL, 100% RUNNING COST FREE. RENEWABLE, SUSTAINABLE AND ZERO RESIDUES.

    WILL POWER AUTOMOBILES,
    SHIPS,
    TRAINS,
    POWER GENERATION PLANTS,
    AIRCONDIRIONERS AND HEATERS.
    SMELTING PLANTS. ETC.

    TECHNOLOGY TRANSFER, MASS PRODUCTION, MANUFACTURING LICENSE IS NEGOTIABLE.

    DR. PATRICK VINCENT TAY

  • Oneplanet1 says:

    iT CAN POWER UP THE ENTIRE CHINA ON THE COST OF LESS THAN A BARREL OF OIL.

    IT IS HERE. MASS PRODUCTION READY.
    LOWER THAN NORMAL CAPEX.
    100% ZERO GHG EMISSIONS, 100% ZERO GAS, OIL OR COAL, 100% RUNNING COST FREE. RENEWABLE, SUSTAINABLE AND ZERO RESIDUES.

    WILL POWER AUTOMOBILES,
    SHIPS,
    TRAINS,
    POWER GENERATION PLANTS,
    AIRCONDIRIONERS AND HEATERS.
    SMELTING PLANTS. ETC.

    TECHNOLOGY TRANSFER, MASS PRODUCTION, MANUFACTURING LICENSE IS NEGOTIABLE.

    DR. PATRICK VINCENT TAY

  • radioam232 says:

    Thanks for this video. This is the heart of the alternative energy sources debate. The huge amount of (preferred) clean energy that is needed to “make” the clean energy to use in our daily life. Let us use time, inventivity, money, energy and natural sources to create solar (and other clean) power plants. They can really help to solve the problem.

  • LazyOtaku says:

    Makes me wanna goto college.

  • taylorgrey2004 says:

    what about resonance electrolysis of water on a pulsed Lawton circuit run on a 12V car battery??

  • ikekll says:

    June 27, 2008
    Solar Energy Projects Frozen By Federal Government
    Faced with a surge in the number of proposed solar power plants, the fed gov has placed a moratorium on new solar projects on public land until it studies their environmental impact, which is expected to take about 2 years.
    The Bureau of Land Management
    says an extensive environmental
    study is needed to determine how large
    solar plants might affect millions of acres
    it oversees in six Western states…
    (source NYT)

  • whatifitsnot says:

    very informative

Leave a Reply

Powered by Yahoo! Answers

Search engine optimization by SEO Design Solutions